Supply, Design & Installation of Submersible Pump- Halat Al Bahrani
Abu Dhabi, UAE
Client
Full Service Facilitties Management
Contract Type
Main Contractor
Completion Date
November 5, 2020
Scope of Works
Fabricate a specialized deep-heat galvanized steel pipe frame (6mm) and bracket for Dewatering Pump Tank-8220 at our factory in Mussafah.
Transport the unit frame to the site location using appropriate vehicles from Mussafah.
Install the unit frame and bracket underwater, along with the pump and an 18mtr X 8” sectioned hose for each pump.
Secure the power supply cable with an 8” pipe in the seabed, assemble all components according to design specifications, and add ballast concrete to the top of 8” HDPE pipes. Additionally, place a warning sign with a yellow flashing light (dimensions: 40cm by 60cm) on the pump for boat protection, and protect the sign from bird waste with nails.
Project Photos
![](https://static.wixstatic.com/media/4139f4_d9b6f5c768be4e5bac649a32c126c199~mv2.jpg/v1/fill/w_165,h_234,fp_0.45_0.68,q_90/4139f4_d9b6f5c768be4e5bac649a32c126c199~mv2.jpg)
![](https://static.wixstatic.com/media/4139f4_c04970c0533d41a9979df60eff43aead~mv2.jpg/v1/fill/w_331,h_234,fp_0.31_0.61,q_90/4139f4_c04970c0533d41a9979df60eff43aead~mv2.jpg)
![](https://static.wixstatic.com/media/4139f4_f473df9a622d4a94a188c67e620de593~mv2.jpg/v1/fill/w_331,h_234,fp_0.35_0.47,q_90/4139f4_f473df9a622d4a94a188c67e620de593~mv2.jpg)
![](https://static.wixstatic.com/media/4139f4_355905bcae6d47d49eab3696494a3b7f~mv2.jpg/v1/fill/w_165,h_234,fp_0.56_0.49,q_90/4139f4_355905bcae6d47d49eab3696494a3b7f~mv2.jpg)
![](https://static.wixstatic.com/media/4139f4_7e0d200a8fc7442dbd34e309fdab211e~mv2.jpg/v1/fill/w_638,h_359,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/4139f4_7e0d200a8fc7442dbd34e309fdab211e~mv2.jpg)