top of page
Supply, Design, Installation of Submersible Pump Special Platform
Al Yasat Island, Abu Dhabi, UAE
Client
HH Sheikh Monsoor Engineering Office - EOM
Contract Type
Main Contractor
Completion Date
March 15, 2020
Scope of Works
Fabricate and install submersible pump frame along the the supplied Dewatering Pump Tank-8220.
Project Photos
![](https://static.wixstatic.com/media/4139f4_b0e00bdcd8b64263bb3792bdd1165db9~mv2.jpeg/v1/fill/w_165,h_234,fp_0.47_0.67,q_90/4139f4_b0e00bdcd8b64263bb3792bdd1165db9~mv2.jpeg)
![](https://static.wixstatic.com/media/4139f4_9d5a3f75d7be47adbc00886687d3cda4~mv2.jpeg/v1/fill/w_331,h_234,fp_0.48_0.63,q_90/4139f4_9d5a3f75d7be47adbc00886687d3cda4~mv2.jpeg)
![](https://static.wixstatic.com/media/4139f4_35c4a029982f4396b22b8b693e9c1798~mv2.png/v1/fill/w_331,h_234,fp_0.47_0.52,q_90/4139f4_35c4a029982f4396b22b8b693e9c1798~mv2.png)
![](https://static.wixstatic.com/media/4139f4_afabc03b4f1d4078bf1c922f784b8674~mv2.png/v1/fill/w_165,h_234,q_90/4139f4_afabc03b4f1d4078bf1c922f784b8674~mv2.png)
![](https://static.wixstatic.com/media/4139f4_cd09a12edf634b96871def29baa72fae~mv2.png/v1/fill/w_165,h_234,fp_0.39_0.49,q_90/4139f4_cd09a12edf634b96871def29baa72fae~mv2.png)
![](https://static.wixstatic.com/media/4139f4_8d38af5670bb4453b538ec0a5be7f84b~mv2.png/v1/fill/w_331,h_234,fp_0.43_0.53,q_90/4139f4_8d38af5670bb4453b538ec0a5be7f84b~mv2.png)
![](https://static.wixstatic.com/media/4139f4_7e0d200a8fc7442dbd34e309fdab211e~mv2.jpg/v1/fill/w_638,h_359,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/4139f4_7e0d200a8fc7442dbd34e309fdab211e~mv2.jpg)
bottom of page